SMC Bathroom Ceiling Panels

Installation

01
Take a measurement (a shorter side : 2 points or more, a longer side : 3 points or more)
02
Check dimension.
03
Locate the body of ceiling panel at the center of a construction place
04
A ventilation fan is located at the center of side panel at a bathtub or shower booth.
05
Install in such an order as : Side flat panel => Body => Side flat panel
06
In a joint area where panels meet, construct the Vis RIB fixation in an internal of evey 30cm.
When constructing, take heed of a size error at the folding area.
07
After checking whether there is any chasm between a ceiling panel and a tile, make a silicon treatment.
08
Wipe out stains.

Note

  • 01
    Check 150mm between the upper line of a tile and the lower part of pipe.
    02
    Check the upper line of a tile/doorframe/window frame.
    (A tile should be the uppermost)
    03
    Remove mortar on the top